Short Plug Repair Welding
Holland’s short plug flash-butt welding provides railways with a higher quality and more cost-effective defect remediation and repair. Traditionally, repair welding gangs rely on a 20’-40’ plug with three pieces of equipment as well as six to eight railroad employees and two Holland employees. With our short plug flash-butt repair welding gang, 5’ plugs are used with two pieces of equipment and a total of four (railroad and Holland) employees.
Along with these benefits, Holland’s flash-butt welding services include our Intelliweld® Control System which provides superior control over the flash-butt welding process.
Learn more about the benefits of Holland Flash-Butt Welding versus Thermite Welding.