Rail transportation costs, rail train availability, and associated logistics are the
most critical factors when planning large-scale rail installation projects.
When delivery of Continuous Welded Rail (CWR) to a site via rail is not a practical or fiscally effective option, a Holland Porta-Plant should be considered. Our porta-plant operations have an average of 8-10 welds per productive hour with our Intelliweld ® Control System. Similar in function and with the same high-quality weld production of a fixed plant, a Porta-Plant will provide greater weld production than a traditional roller line
setup for less capital investment than CWR from a fixed plant.
With our years of experience operating these plants, our full turnkey crews tend to
be 1-2 welds per hour more productive than crews with multiple
stakeholders/contractors.